  1. Building Description

The building under study is located in --------- at -------- Street.

The building consists of the ground and first floors. The building is used as workers' accommodation.

The structure is blockwork-bearing walls. Closely spaced wood beams support the plywood or corrugated sheets. These beams are supported by the bearing walls. Bearing blockwork walls transfer the loads to the foundation. The Bearing walls' foundation is a strip-type footing made of rocks arranged in layers. Figure 1 illustrates the building.

structural,building construction and design,structural engineering,building foundation,structural analysis,rsg 3d building materials,building standards,eps technology in building,eps technology in building in pakistan,building arbor,eps building technology in india,building permit,building pergola,non destructive testing of concrete,non-destructive testing of concrete,concrete footings,construction,non-destructive testing,how to pour a concrete patio


2.   Visual inspection

 

During the physical observation, considerable areas were exposed and checked, and a general assessment was conducted. Investigation for various signs of deterioration was inspected, such as cracks' patterns, delamination of concrete, etc. Also, signs of excessive deflection and distress such as differential settlement and shear cracks were carried out.

 

The physical observations made during the inspection are summarized below, and figures from 2 to 7 present part of the conducted visual observation.

 

1.     Vertical and horizontal cracks were observed in the building’s walls.

2.     Most of the wood beams are worn. Also, most of the beams are highly stressed and deflected.

3.     Many beams are rotten with clear trails of mold.

4.     Roof’s plywood is deteriorated in many places and removed in some areas.

5.     Several places have a sign of water leakage.

6.     Humidity is obvious in all rooms.

7.     Walls paint peeling is clear in many places, as well as the separation of the finishing layer.

8.     Many walls patching and repaired defects were observed.

9.     An unleveled floor is noticed in many places.

10. Many services serious problems were observed.

11. The roof's waterproofing system is damaged.

12.  The building was recently repainted inside.

13.  Many blockwork-bearing walls and beams were unsafe.

structural,building construction and design,structural engineering,building foundation,structural analysis,rsg 3d building materials,building standards,eps technology in building,eps technology in building in pakistan,building arbor,eps building technology in india,building permit,building pergola,non destructive testing of concrete,non-destructive testing of concrete,concrete footings,construction,non-destructive testing,how to pour a concrete patio

structural,building construction and design,structural engineering,building foundation,structural analysis,rsg 3d building materials,building standards,eps technology in building,eps technology in building in pakistan,building arbor,eps building technology in india,building permit,building pergola,non destructive testing of concrete,non-destructive testing of concrete,concrete footings,construction,non-destructive testing,how to pour a concrete patio

structural,building construction and design,structural engineering,building foundation,structural analysis,rsg 3d building materials,building standards,eps technology in building,eps technology in building in pakistan,building arbor,eps building technology in india,building permit,building pergola,non destructive testing of concrete,non-destructive testing of concrete,concrete footings,construction,non-destructive testing,how to pour a concrete patio
structural,building construction and design,structural engineering,building foundation,structural analysis,rsg 3d building materials,building standards,eps technology in building,eps technology in building in pakistan,building arbor,eps building technology in india,building permit,building pergola,non destructive testing of concrete,non-destructive testing of concrete,concrete footings,construction,non-destructive testing,how to pour a concrete patio  

3.  Tests

 

Due to the nature of the building and the uncertainty about the existence of reinforced concrete elements, tapping the walls with a steel hammer was carried out to locate concrete areas to inspect, but no concrete elements were found.

However, a verification core was extracted from one area, and it was evident that the wall was built from blockwork filled with cement mortar.

 

A trial pit had been dug to inspect the type of footings. The trial pit was located at the corner of some buildings and the excavation reached the external wall foundation.

     

4.   Discussion of the Visual Inspection

Based on the conducted visual inspection and observations, and the experience with similar buildings, the structure had been undergoing a normal deterioration due to the aging effect combined with the influence of the temperature and humidity variation, and lack of proper and continuous maintenance. Also, due to the footing nature, some places experienced settlement due to the strata subsidence that led to diagonal cracks.

The excessive deflection in most of the roof’s beams leads to ponding that allows the rainwater to accumulate and deteriorate the roofing system further.

The building is unsafe as there are many beams and bearing walls with huge and serious cracks, in addition, it is extremely deteriorated, although the building was recently repainted inside.

 

5.     Conclusion

From the preceding observation and investigation, the structural condition of the building is considered potentially hazardous and unsafe, and 90% of the building’s structure requires extensive maintenance, retrofitting, and robust.


End of Report

 

 

 

Hussein Abdeldayem

أكثر من أربعة وعشرون (24) عامًا من الخبرة في مشاريع البناء والتشييد بما يخص تنفيذ واستلام بنود الاعمال المدنية والتشطيبات والتصميم الإنشائي وتقييم الحالة الإنشائية للمباني القائمة ووضع الحلول الإنشائية المناسبة لتحسين حالة المبنى وإعادة تأهيله، ونسعى إلى الاستثمار في اكتساب خبرات تنفيذ الأعمال المدنية والتشطيبات والتميز في مجال العمل والوصول لأكبر مكاسب في أقل وقت.

Post a Comment

Write your comment or inquiry on the topic

Previous Post Next Post

نموذج الاتصال